What the rules do to land in Dholera

If you own land in Dholera, or you are being sold some, the thing that decides what can be built on it is a government document, not the price. This site reads those documents and tells you what they say, in ordinary words.

PageStart here
Edition2026-08-04
Last verified2026-08-04
Documents behind it22
In plain words

In 2009 the Gujarat government drew a line around twenty two villages south of Ahmedabad and called the land inside it the Dholera Special Investment Region. A notification is simply the government order that does this, printed in the state gazette.

Inside that line, land is being reorganised through town planning schemes. A town planning scheme takes everyone's fields in one area, keeps part of the land for roads, parks, schools and land the authority can sell, and gives each owner back a smaller, regular plot in roughly the same place. Nobody is bought out. Everybody gives up a share.

So the question that matters for a piece of land here is not what it costs. It is which scheme it sits in, what stage that scheme has reached, and how much of it the scheme takes. This site answers those three questions from the government's own documents, and prints the questions the documents do not answer.

22
Villages inside the line
Named one by one in the order of 22 May 2009, GHU-14/SIR/112009/253/(1)/I. OFFICIAL
879.3377
Square kilometres in total
The total printed in the gazette of 4 June 2009, Part IV-B, printed pages 40 to 41. OFFICIAL
14,574
Survey numbers
A survey number is the government's id for one piece of land. Every plot sits inside one. OFFICIAL
8
Scheme records held
Six numbered schemes in the plan of 10 September 2012, plus two extra signed sheets. OFFICIAL
01

Nobody buys your land. A share of it is taken

This is the part most people get wrong, so it is worth being exact about it. A town planning scheme is not land acquisition. The government does not buy the field and pay compensation for it. Instead the boundaries of every field in the scheme area are redrawn together, a percentage of the land is kept back for public use, and each owner receives a new plot carved out of what remains.

The plot you had before the scheme is called the original plot. The plot you are given back is called the final plot. It is smaller, it is a more regular shape, and the Act says it should be as close as possible to where the original plot was.

The Development Plan for Dholera states the mechanism in one paragraph.

Under the Town Planning (TP) Schemes land is not acquired by the Government agency. It is reshaped, readjusted and returned to the original owner. Generally when a Town Planning Scheme is laid in an area, a certain per cent of land is deducted from original plot and utilised in providing common infrastructure and facilities like roads, gardens, play grounds etc. Land parcels retained by the authority are then used for 'public purposes'.

dp_report1.pdf, p.182, Section 10.5 The Proposed Strategy for DSIR, OFFICIAL

How large that share is, and what the documents actually promise about it, is set out on the deduction page. What the different classes of land are called, and which ones these documents never define at all, is on the land classes page.

02

The eight schemes, and how far each has got

The 2012 Development Plan cuts the region into six numbered town planning schemes. Two more sheets exist, marked 2/A and 4/A, signed in their own right. No document we hold says how those two relate to schemes 2 and 4, so this site keeps eight separate records and does not guess at a relationship.

The stage column matters more than the area column. A draft scheme is a proposal. A preliminary scheme has been sanctioned and can be acted on. Until a scheme is sanctioned, the plot boundaries in it are not settled.

The eight scheme records Source: tp-schemes.json, built from the scheme sheets, the Apex Authority notifications and the Final Development Plan
SchemeStageArea, sq kmPart villagesGovernment order
Scheme 1draft51.404SIRAA/03/2012/566-A
Scheme 2no stage stated102.34no list suppliednone supplied
Scheme 2/Apreliminarynot in the TP table4none supplied
Scheme 3sanctioned draft66.608SIRAA/06/2013/439
Scheme 4no stage stated60.00no list suppliednone supplied
Scheme 4/Apreliminarynot in the TP table2none supplied
Scheme 5no stage stated74.75no list suppliednone supplied
Scheme 6no stage stated67.33no list suppliednone supplied

Every area comes from a single place, the TP TABLE inset of Figure 10-2 in dp_report1.pdf p.183, whose own column header says approximate.

The full record for each scheme, including who signed it and what the sheet warns you about, is at the scheme register. If you want the order the stages happen in, read who signs off a scheme.

03

The twenty two villages, and how uneven they are

The 2009 order does not draw a circle on a map. It lists twenty two named revenue villages and says the land of those villages is now the region. So the first useful question about any plot here is simply which of those villages it is in.

They are nothing like the same size. Bavaliyari covers 111.2724 sq km. Bhimtalav covers 7.4042 sq km, which is smaller by a factor of more than twenty.

Notified village areas on a common scaleOne vertical hairline for each of the twenty two notified villages, positioned by the area recorded against it in the 2009 schedule.020406080100SQ KM RECORDED IN THE 2009 SCHEDULE
Each hairline is one village, placed by the area recorded against it in the 2009 order. Source: gazette_mirror.pdf pp.1 to 2, printed pages 40 to 41. Drawn from the dataset when this page was generated.

Each village has its own page in the village register, showing which schemes name it, how it is spelled on each document, and what the sources do not say about it. Nineteen of the twenty two sat in Dhandhuka taluka and three in Barwala, which is explained on the taluka page.

04

The fifty per cent everyone quotes, read carefully

You will hear that Dholera landowners give up half their land and keep half. The documents we hold say something narrower than that, and the difference is worth understanding before anyone signs anything.

One sanction, for Draft Town Planning Scheme No. 3, tells the Town Planning Officer to keep the deduction at an average of 50 per cent, with a list of named exceptions. An average across a whole scheme is not a promise about any single plot. One plot can lose more than half and another less, and the average still holds.

No document in our set turns that sentence around and states what an owner gets back. That figure is arithmetic somebody else did, not a government commitment, and this site will not print it as though it were one.

Dated 24 October 2013. Source notif_dtps3.pdf p.2. OFFICIAL The direction appears in the scheme 3 sanction only. Our file set has no equivalent instruction for any of the other seven records.

The full wording, the exceptions and the separate money charge that is often confused with it are on the deduction page and the betterment page.

05

Questions this site answers

Each of these pages answers one question and nothing else. If you only read one thing here, read the first.

06

How to read anything on this site

Every number shows where it came from

The value, the unit, the date it refers to, and the document and page it was read from. Nothing here is remembered or copied from a listing site.

How this is built

Missing things are shown as missing

Four schemes have no village list, and six have no government order in our documents. Those cells say so. Nothing is filled in by guesswork.

What is missing

Rules are quoted, never summarised away

Where a rule matters, the exact sentence appears with its Act, its section and its page. If we do not hold the rule, the page says so.

The exact wording

You can take the data

Both source files, four tables built from them, and the word audit, as JSON and CSV. No sign-up.